葡京娱乐场4759.首页欢迎您

Metal Work Field

The system covers surface of 10500mm*6000mm and consists of FANUC robots and 10 m long ground rails. Furthermore, it includes robot gripper, protection, water-containing plate, loading/unloading roller table, work-piece tray, machine tool fixture and tray transition mechanism etc. Robot system operates with 8 CNC loading and uploading materials automatically.

Metal Work Field

Process description:

1. Put the work-piece on loading pipeline manually;

2. Robot picks up the work-piece from V-block, which is fixed on pipeline, make it pass the secondary fixed station before put it on NO.1 machine tool;

3. After the processing on NO.1 machine tool is completed, robots go back to loading position for reloading.



Injection Molding Work Field

Control the robot for automatic pick-up and convey by program. Combined with other automatic assisting equipment to realize the action like automatic pick-up, mold blowing, chamfering and unloading. Manpower won鈥檛 be needed during the working except for material shortage.

IT Product Polish

Each robot corresponds to two stations;Eachworker is responsible for loading/unloading of two stations. It鈥檚 wet polish.

Watch Shell Polish

Watch shell polish is mainly completed by robot, except for handwork like putting the product on tray and unloading from it after polishing. If needed, robot can do the whole job.